sorry, but another question
ok so i was just wonderin if the way i set up the turbo is ok. it looks like there is barely any room to run the ic piping up to the intercooler, and also barely any room for the dp. im hopefully having all this done by a muffler shop on friday, and was just wondering if you all think that there would be enough room.
i plan to run 2.25"piping from turbo to ic, and 2.5" piping from ic to tb, and 2.5" dp. here are the pix: http://memimage.cardomain.net/member...1_109_full.jpg http://memimage.cardomain.net/member...1_110_full.jpg ^ i know that one is kinda at a wierd angle, its kinda upside down, but im sure you see what im sayin that theres not much room. is it still doable without much cutting? thanx matt |
Re: sorry, but another question
First off, clock your compressor housing so it isn't pointing forward. And second, you have plenty of room for a downpipe.
|
Re: sorry, but another question
ok for sure.
|
Re: sorry, but another question
Bring the compressor housing around to meet the wastegate acuator. You have plent of room for a downpipe. Sexy manifold BTW. ;)
|
Re: sorry, but another question
how 'bout this 8)
http://memimage.cardomain.net/member...1_111_full.jpg and i know, the mani is the seksiest!!! i just wanna :-* it. |
Re: sorry, but another question
Might wanna clock it ccw a little bit but the camera angle is funny so it might be fine right there.
|
Re: sorry, but another question
the camera is from the driver side of the car. then the ic is mounted to the left and the compressor housing is facing downward, but not completely downward. its ok in that position right? because if i rotated it counter clockwise it will not really be facing downward either, but downward and towards the block.
|
Re: sorry, but another question
You want to clock the center section so that your oil inlet and outlet are STRAIGHT up and down (if it's not already--camera angles are kind of bad).
And I would rotate the compressor housing until the outlet points straight down. It doesn't have to and I'm sure the wastegate actuator might make that more complicated... But you also need to keep in mind how you're going to run the IC pipes. So however you set it now, it's probably going to change in the end. Looks good so far... I almost miss building a kit. ;) |
Re: sorry, but another question
is that jb weld on the flange?
edit: i read your other thread, i bet that stuff last about 8-9 minutes |
Re: sorry, but another question
Originally Posted by ghettoturbo
edit: i read your other thread, i bet that stuff last about 8-9 minutes
|
All times are GMT -5. The time now is 05:15 AM. |
© 2024 MH Sub I, LLC dba Internet Brands