Stock head studs for D16y8
#12
Re:Stock head studs for D16y8
Way off topic....
Only waiting on crankshaft before the whole bottom end machining is done. Got a call today the the crank is coming back on Monday. So next week I'm sending everything to the balancer and he should have it about 3-7 days. After I pick it up from there all there will be to do is assemble everything. Then install it. When is it gonna be done?? who the ---- knows. At least with all of this time, I have really concentrated on making sure everything is done the right way. I'd hate to rush through a project like this. coughhotrexcough.
----, I guess this thread is over. I'll call you Josh and you can send the studs with the ****.
Only waiting on crankshaft before the whole bottom end machining is done. Got a call today the the crank is coming back on Monday. So next week I'm sending everything to the balancer and he should have it about 3-7 days. After I pick it up from there all there will be to do is assemble everything. Then install it. When is it gonna be done?? who the ---- knows. At least with all of this time, I have really concentrated on making sure everything is done the right way. I'd hate to rush through a project like this. coughhotrexcough.
----, I guess this thread is over. I'll call you Josh and you can send the studs with the ****.
#15
Re:Stock head studs for D16y8
Originally Posted by Stealthmode
Way off topic....
Only waiting on crankshaft before the whole bottom end machining is done. Got a call today the the crank is coming back on Monday. So next week I'm sending everything to the balancer and he should have it about 3-7 days. After I pick it up from there all there will be to do is assemble everything. Then install it. When is it gonna be done?? who the ---- knows. At least with all of this time, I have really concentrated on making sure everything is done the right way. I'd hate to rush through a project like this. coughhotrexcough.
----, I guess this thread is over. I'll call you Josh and you can send the studs with the ****.
Only waiting on crankshaft before the whole bottom end machining is done. Got a call today the the crank is coming back on Monday. So next week I'm sending everything to the balancer and he should have it about 3-7 days. After I pick it up from there all there will be to do is assemble everything. Then install it. When is it gonna be done?? who the ---- knows. At least with all of this time, I have really concentrated on making sure everything is done the right way. I'd hate to rush through a project like this. coughhotrexcough.
----, I guess this thread is over. I'll call you Josh and you can send the studs with the ****.
#16
Re:Stock head studs for D16y8
Originally Posted by d16z64life
Youll never be done....to tell you the truth I dont even think this moter is exists!Its like a make believe friend.Only you can see it :P
]
#17
Re:Stock head studs for D16y8
Originally Posted by Stealthmode
Originally Posted by d16z64life
Youll never be done....to tell you the truth I dont even think this moter is exists!Its like a make believe friend.Only you can see it :P
Don't mind him, he just knows he won't have ---- to say when I'm done. Thats why he's getting it out of his system.
]
Thread
Thread Starter
Forum
Replies
Last Post
BoostCraze
Wanted
3
01-25-2006 09:22 PM