THE FINISHED PRODUCT, HMT FAB STATION HOTREX/98REDCAVZ24 STYLES
#1
THE FINISHED PRODUCT, HMT FAB STATION HOTREX/98REDCAVZ24 STYLES
here she is, my smiley tools arrived yesterday, after hrs and hrs of making the benches, shelves, ect, running around scoring tungsten, my 92 cube bottle of argon, rod, new mask, fittings, ect ect. and almost 1600 later, shes finally finished
when i recieved my smiley combo, i noticed the plasma gun was of better quality than the older units, like csaddict owns. i ran a 75 foot 10/3 power cord out my back hatch under my deck and into my garage. tapping my drier plug.
overall it came out gangster, and petey was a huge help im pumped.
when i recieved my smiley combo, i noticed the plasma gun was of better quality than the older units, like csaddict owns. i ran a 75 foot 10/3 power cord out my back hatch under my deck and into my garage. tapping my drier plug.
overall it came out gangster, and petey was a huge help im pumped.
#2
Re: THE FINISHED PRODUCT, HMT FAB STATION HOTREX/98REDCAVZ24 STYLES
How much space do you have?
$88 at Lowes buys a 25X46" Kobalt worktable with two drawers and a bottom shelf for the welder to sit on. Just needs vise, and a skin of metal across the top. That's the way I'd have gone, in that respect.
$88 at Lowes buys a 25X46" Kobalt worktable with two drawers and a bottom shelf for the welder to sit on. Just needs vise, and a skin of metal across the top. That's the way I'd have gone, in that respect.
#3
Re: THE FINISHED PRODUCT, HMT FAB STATION HOTREX/98REDCAVZ24 STYLES
the welding table i have there costed me 7 dollars.
and that was for the piece of sheet metal to go on top as the welding surface.
the leg of the welding table are 2 tv trays, i shot 3 3 inch screws into the studs in the wall and shes sturdy as ----. this i shmt right?
so for 2 benches and sheetmetal top. i payed a total of 36 dollars for the material to build both.
and that was for the piece of sheet metal to go on top as the welding surface.
the leg of the welding table are 2 tv trays, i shot 3 3 inch screws into the studs in the wall and shes sturdy as ----. this i shmt right?
so for 2 benches and sheetmetal top. i payed a total of 36 dollars for the material to build both.
#10
Re: THE FINISHED PRODUCT, HMT FAB STATION HOTREX/98REDCAVZ24 STYLES
You're lucky if that's 250 sq ft.
Well, if you don't try to stockpile things (seven B18A/B, four D15/D16, four *cars*, etc) it will make adequate workspace, but you won't be able to do everything.
Well, if you don't try to stockpile things (seven B18A/B, four D15/D16, four *cars*, etc) it will make adequate workspace, but you won't be able to do everything.